The other day a sub-contractor from Verizon called to schedule an appointment to run cables through our apartment for our neighbor. We agreed on Monday between 3-4PM, Pat was available to be there. The guy called me at 2:45pm Monday to inform me that he was unable to come because of some rule of doing 2 apartments at once. I was very unhappy as Pat waiting for the guy and I had completely emptied the closet as they asked me to do. I let him know that we were available on Saturdays (except this one) and if they needed another weekday they would need to call and see if Pat was available.
So I call the front office today to check on the oven problems, only to find out that the contractor is telling everyone that I canceled on him. He also is saying I won't work with him at all on rescheduling an appointment. GRRRR! I could not believe what I was hearing. I was Pissed (and still am). I called Pat to vent and he was impressed at how mad I was, as I am usually good at keeping my temper in check.
Anyway when I got home I went to talk with my neighbor and let her know what was going on. I also let her know exactly what I was planning on telling the contractor. She nicely gave me the Supervisors phone # so I could call him directly. She seemed a little upset at first but I think she understood, though she did let me know that she needed it done as soon as possible.
I just want them done so I can get Verizon out of my life. At least Chris is calling to tell off the Verizon person. I almost wish I could call him myself.
Today's steps; 9529.
Thursday, June 19, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment